Edgar Quinet (2008)

Colombes City Council  -  2000000  -  February 2008
Work coordination on the elements of the square. 
Amount of work : 2 000 000 euros
Architect : Serge Eyzat
Contractor : Colombes City Council
Imprimer cette page
Belvedere with metallic pergola

Belvedere with metallic pergola

Outside view of the belvedere and its metallic pergola

Path in stabilized sand

Path in stabilized sand

Shaded pathway with natural gravel

Metallic pergola

Metallic pergola

Promontory and its metallic pergola

Children's playground

Children's playground

Children's games on a soft surface

Alignment of lime-trees

Alignment of lime-trees

Alignment of lime-trees

Water and metal

Water and metal

Guard rail and waterfall

Central waterfall

Central waterfall

Waterfall and collection basin

Metallic guard rail

Metallic guard rail

Metallic guard rail protecting the central lawn

Flowerbeds around the lawn

Flowerbeds around the lawn

Perennial flowerbed and box

Small steps

Small steps

Small steps and metallic guard rail

Bench with backrest

Bench with backrest

Wooden bench and scented roses

Basketball ground

Basketball ground

Basketball ground and protection net

Barred fence

Barred fence

Fence with metallic bars

Benches without backrest

Benches without backrest

Alignment of benches on stabilized surfacing

General view of the square

General view of the square

View of the box patterns, waterfall and bandstand

Rose bed

Rose bed

Association of plants and barred fence

Barred fence

Barred fence

Barred fence