Skip to main content

Toutes les références

Ambiance sketch of the entrance drawn from the site plan

Mirabeau

AAEV  -  February 2011

Private property: Computer Graphics Design Creation of ambiance sketches Texture maps

Californian Farms

SCI l’érable  -  Budget : 100000  -  February 2011

Aménagement de la ZAC : les fermes californiennes

Slab garden

Budget : 220000  -  February 2006

Jardin privé sur dalle à Paris : Mission de communication de projet en 2006 et d’assistance aux pièces techniques. Montant des travaux : 220 000 euros TTC

Gergovie

Privé  -  Budget : 1500  -  February 2010

Development study for an inner courtyard.

Trianon of Versailles

February 2006

Garden of the Great Trianon at Versailles Cost: 2000000 VAT. Consultancy and implementation technical assistance. Plantation management and paths implementation.

Trianon

Orangery of Versailles

February 2006

Technical assistance to the company carrying out the work (Robert Paysage): CADD Soil Modeling of the orangery (AutoCAD and Land designer) to optimize the cut / fill and stormwater management.

Louvre

Budget : 200000  -  February 2008

Louvre School, Paris : Site analysis, technical assistance (sectional drawing) for the company realizing the work. Budget around 200,000 euros ATI.

Versailles English Garden

May 2009

Our tasks : technical assistance during conception and realization ; computer-assisted surface study and plantation map ; landscape mapping including plantation spots and assisted path design. End of the work in 2009.

Composting station

February 2010

Creation of a waste processing area for the vegetal waste issued from the maintenance of the Charles-de-Gaulle airport (Roissy) green areas (pruning, mowing,…). This area was conceived by M. Divo (ecologist and landscape designer) and implemented by Entreprise Robert (landscape design company). Our role was to assist on project communications.

St Aignan

Anne-Frank  -  Budget : 15000  -  February 2008

Modeling of a trellis for the Anne-Frank public garden in Paris. Modeling is done before production in order to establish precise measurements needed for the components of the structure (lath lenght, curb of posts, etc). Cost: 15 000 euros VAT Date: 2008

Sand of Brévannes

Les Sables de Brévannes  -  Budget : 37000  -  February 2011

Quarry “Les Sables de Brévannes” Engineering consultancy: Building a case study for modifications on a quarrying site. The file includes: A general impact study An environmental study A noise impact study A hydrogeological study Cost: 37 000 euros VAT Customer: Les Sables de BrévannesDate: 2011  

Montevrain

Budget : 2500000  -  May 2008

Study for the implementation phase of the project including: General stormwater management Roads and utilities study regarding the car parks Development project regarding the green areas Budget for the works: 2 500 000 euros Date: 2008

Phytosanitary study

Oralia morel  -  March 2012

Phytosanitary Study  Exhaustive survey of a population of 600 trees in a private residenceThe statement includes: The identification of plant Its phytosanitary state Suggested course of action Date: Early 2012 Ecologist: Alain Divo Customer: Oralia Morel  

Chaumont

February 2010

Participation to the International competition of the Chaumont-sur-Loire gardens.  Competition subject: “Gardens, body and soul”

Tramway of Angers

February 2009

Assistance in realizing implementation plans for the turfing of the Angers tramway. Plans made according to a very strict and precise graphic style guide accounting for all roads and utilities constraints (slopes, networks).

Marie-roux

Budget : 4200  -  February 2010

Study for the redevelopment of the square behind the City Hall of Rambouillet.  Pre-construction services

Japanese garden

Budget : 70000  -  February 2006

Development of a street corner in Colombes Design of a Zen garden

Golf of Marivaux

February 2009

Winner of the contest for the redevelopment of the Marivaux golf course access.

Golf of Torcy

May 2007

Engineering mission on implementation phase Implementation in all the station Calculation of volume measurements Rainwater management and flow simulation by computer Software: Land Designer Date: 2007 Architect: Alain Prat

Golf of Marrakech

February 2005

Project Management Assistance for the 3D modeling of earthworks, calculating volumetrics, profiles and sections of channel. For this golf course, we have adjusted the “project” spot heights to find the best cut/fill balance with the help of 3D terrain modeling and calculation simulations. The resulting landscape offered less than 5% variation from the calculations. Architect […]

Golf of Agde

April 2011

Engineering consultancy on the realization of a golf course. Technical assistance on the earthworks. Volume Measurement Creating Profiles Cut / fill display Stormwater Management Date: 2011 Architect: Alain Prat Software used: AutoCAD Civil 3D

Center Parc

Budget : 3000000  -  January 2007

Leisure Center : center parc d’ailette.  

drone
Studies
Training